EV chargers

The site assessment is
most of the job.

An EV charger install is rarely just an install. The supply has to take it, the board may need work, the paperwork depends on the state, and the customer has usually been told by someone that it is a two-hour job.

Book a free meeting

Before the quote

What the site can
actually support.

Existing supply, board capacity, cable run, whether load management is needed and what the switchboard will require. Captured at assessment so the quote reflects the job rather than the hope.

Where a rebate or an approval applies, the paperwork attaches to the job, so it is not a separate thing someone has to remember to lodge.

Assessment

recorded, with photos

The board as found, the run, the mounting location. It is the evidence for the quote and the brief for whoever does the work.

Approvals

kept with the job

Network approvals and rebate paperwork tracked against the install rather than in a separate pile with its own deadlines.

Handover

the customer knows how to use it

Commissioning and handover recorded, which prevents the callback that is not a fault.

The rest of the family

Same build, shaped for
a different trade.

Each one is the same idea — your quoting, your jobs, your invoicing, in one system you own — fitted to how that trade actually works. Built in Brisbane by Kindra AI.